Skip to the main content Skip to the instrument panel
0 Help Book a demo
Weather and agronomy
Air temperature 11 °C
Feels like 9 °C
Conditions Light cloud
Rain today 2.4 mm
Rain last 7 days 18.6 mm
Season to date 412 mm
Wind speed 9 mph
Wind direction WSW
Gusting 17 mph
Humidity 78 %
Pressure 1014 hPa
Delta T 3.1 Evaporative potential during spraying. Outside 2 to 8 the application window is compromised.
UV index 2
Next 24 hours
Five day outlook
Field conditions
Soil temperature at 10cm 8.4 °C
Soil moisture deficit 26 mm
Growing degree days 742 GDD
Frost risk tonight Low
Spray window Open Combines wind speed, Delta T, temperature and rainfall forecast against label conditions.
Travelling conditions Marginal
Workable days this month 11 days
Blight risk Low
Grass growth rate 38 kg DM/ha/day
Latest satellite pass 2 days ago
Time and season
Time
Date
Sunrise
Sunset
Day length
Moon phase
Season
Week
To harvest
Markets and prices
Feed wheat 184.50 £/t
Feed barley 168.00 £/t
Oilseed rape 412.00 £/t
Farmgate milk 43.20 p/l
Deadweight beef 612 p/kg
Deadweight lamb 698 p/kg
Deadweight pig 214 p/kg
Ammonium nitrate 378 £/t
Red diesel 72.4 p/l
Electricity 25.8 p/kWh
Woodland carbon unit 28.32 £
Biodiversity unit 25,000 £
Schemes and deadlines
Open scheme windows 3
Budget allocated 52 % How much of the current scheme budget has been committed. Published at 25, 50 and 75 per cent.
Next deadline 15 May
Claim status In progress
Payments due 18,420 £
Compliance score 86 %

Instrument values are sample data until your holding is connected to a live source. How the data connections work

Traceability & Provenance

Traceability: How It Works

The end-to-end sequence, stage by stage, with nothing skipped.

The module is modelled as an explicit state machine with 8 stages. Every record knows which stage it is at, what has to happen to move on, and what is blocking it if it cannot. Traceability is a legal requirement and a commercial asset. This module maintains lot-level records forward and backward through every process step, supports a timed recall exercise that actually works, and turns the same underlying data into consumer-facing provenance that is substantiated rather than asserted.

End to end

How Traceability runs, start to finish

The module is modelled as a state machine, so at any point the business knows exactly which stage every record is at and what has to happen next.

  1. 1

    Define lots at every process step

    This is where the record starts, and getting it right here removes work at every later stage.

  2. 2

    Record inputs and outputs against each lot

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. 3

    Code and label with the lot identity

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. 4

    Link suppliers and customers one step each way

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. 5

    Carry attributes through processing

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. 6

    Publish provenance to the consumer

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

  7. 7

    Run mock recalls on a schedule

    Results feed the whole-farm view, so the effect of this stage is visible against the rest of the business.

  8. 8

    Execute a real recall if required

    The cycle closes here, and what is learned is carried into next season's plan rather than lost.

Sequence

The order things happen in

  1. Stage 1

    Define lots at every process step

    This is where the record starts, and getting it right here removes work at every later stage.

  2. Stage 2

    Record inputs and outputs against each lot

    The platform prompts only for what this stage genuinely needs, and carries everything forward.

  3. Stage 3

    Code and label with the lot identity

    Conflicts with scheme rules, regulatory windows and existing commitments are flagged here rather than discovered later.

  4. Stage 4

    Link suppliers and customers one step each way

    Capture works offline, so this stage is completed in the field rather than remembered afterwards.

  5. Stage 5

    Carry attributes through processing

    Everything recorded at this point becomes evidence automatically, in every format that will later ask for it.

  6. Stage 6

    Publish provenance to the consumer

    This is the stage most businesses currently do twice, once for the operation and once for the paperwork.

Before you start

What you will need, and what the module handles for you

Most of this comes across automatically once your holding is registered. The list is here so nothing arrives as a surprise.

In practice

Six things Traceability changes on day one

None of these requires a new process. They all come from recording the work you already do, once, in a form the rest of the platform can use.

Lot creation and splitting through

Lot creation and splitting through every process step.

One-step-back and one-step-forward supplier and

One-step-back and one-step-forward supplier and customer linkage.

Field-to-pack traceability using the platform

Field-to-pack traceability using the platform production record.

Batch and lot coding with

Batch and lot coding with label generation.

Mock recall exercise with timing

Mock recall exercise with timing and completeness measurement.

Real recall execution with affected

Real recall execution with affected lot identification and notification.

Traceability

The chain behind one batch

Assurance audits ask you to prove a chain you have already lived. The record is assembled as the work happens, so the audit pack is a printout rather than a fortnight of searching.

Sample
Batch reference BATCH-759F43
Subject One load
Record opened On first record

Take the record with you

Sample chain showing the structure and the evidence each stage produces. Statutory reporting windows differ by nation and species — the platform applies the window for the nation the movement happened in, not the one the business is registered in.

Sample

Questions answered

What people ask about Traceability

Does this replace the software I already use?

Not necessarily. Agrivencia integrates with authoritative sources and mainstream packages rather than insisting on replacing them. Where an incumbent does one job well, the platform connects to it; where the job spans several systems and nobody does it, the platform does it.

Will it work where I have no signal?

Yes. Field capture in Traceability is offline first, storing locally and synchronising when a connection returns. Only around a fifth of UK farms report reliable signal across the whole holding, so this is a design assumption rather than a feature.

What happens when the scheme rules change?

Scheme rules are held as data rather than code, so a rate change, a cap change or a window closure is a content update that takes effect the same day. The platform also alerts you to what the change does to your own position.

Who owns the data I put in?

You do. The Farm Data Charter gives you a complete export in open formats at any time, and every instance of data sharing requires an explicit, revocable consent that is visible in your account.

Does it work if I farm across a border?

Yes, and that is one of the main reasons the platform exists. A business with land in more than one nation sees one reconciled view rather than two portals, with obligations and deadlines from both administrations in a single calendar.

Can my agronomist or land agent use it too?

Yes. You grant scoped, time-limited access per holding and per module, and you can revoke it in one click. Advisers never get a shared password or a blanket view.

What is the biggest limitation of this module?

Broken linkage at a process step. Mitigated by mandatory lot capture. We would rather state that plainly than let you discover it after signing.

What we are hearing

The problems people describe to us

These are composite statements drawn from user research conversations, not attributed customer quotes. We publish named references only with written consent.

I am not short of software. I am short of one place where the same field means the same thing in all of it.

Arable farm managerEast of England

The scheme closed on a Tuesday evening. I had the application half built. Nobody told me the budget was nearly gone.

Mixed farmerMidlands

We farm on both sides of the border. Everything takes twice as long and I still cannot see the whole position on one screen.

Livestock producerWelsh border

Audit week costs me three days. Every single record they ask for is already written down somewhere on this farm.

Dairy farmerSouth West

See Traceability running on your own holding

Thirty minutes, using your parcels, your schemes and your enterprises rather than a sample farm. No obligation and no sales script — if it does not fit your business we will say so.

  • Free tier available
  • No card required
  • Your data stays yours
Next deadlines
15 May Single application form — Wales and Northern Ireland Window 2 open Sustainable Farming Incentive — England, 52% allocated Ongoing Capital grants — allocation moves fast once open Annual Whole Farm Plan components — Scotland, phased deadlines 6 April Inheritance relief cap takes effect — UK wide